- Reliable process exhaust management with an air volume flow of 24,000 m³/h
- Buffer tank (3 m³) ensuring consistent heat supply
- Precise temperature control through four heating circuits
- Durable materials for maximum safety
- Efficient operation enabled by a modern control system
Key Project Measures
- Installation of a new cooling system with a modern Quantum AIR chiller (refrigerant 1234ze)
- Integrated free-cooling function for direct cooling at low ambient temperatures, significantly reducing energy consumption
- Integration of the existing hot-water network via heat exchangers to ensure demand-oriented heat supply
- Installation of a 3 m³ buffer tank to compensate for temperature fluctuations
- Four independent heating circuits for the electroplating systems using high-performance instantaneous heaters
- Installation of a 9 m long rooftop ventilation unit with special materials suitable for chemical exhaust air