- Total Cooling Capacity: 200 kW
- Finished goods warehouse Cooling: 3 × 18 kW
- Printing department Cooling: 2 × 55 kW
- Film section Cooling: 2 × 18 kW
- Chilled Water System: 11 / 17 °C supply / return
- Piping Network: over 250m of chilled water and condensate piping
Key Project Measures
- Connection of the finished goods warehouse, printing department, and film processing area to the central chilled water distribution system
- Installation of high-capacity recirculating air cooling units in the respective areas
- Replacement of existing split air-conditioning systems in the film processing area
- Installation of chilled water and condensate piping, including insulation
- Integration into the existing measurement, control, and automation system